logo
Product categories

EbookNice.com

Most ebook files are in PDF format, so you can easily read them using various software such as Foxit Reader or directly on the Google Chrome browser.
Some ebook files are released by publishers in other formats such as .awz, .mobi, .epub, .fb2, etc. You may need to install specific software to read these formats on mobile/PC, such as Calibre.

Please read the tutorial at this link.  https://ebooknice.com/page/post?id=faq


We offer FREE conversion to the popular formats you request; however, this may take some time. Therefore, right after payment, please email us, and we will try to provide the service as quickly as possible.


For some exceptional file formats or broken links (if any), please refrain from opening any disputes. Instead, email us first, and we will try to assist within a maximum of 6 hours.

EbookNice Team

(Ebook) Construction scheduling, cost optimization, and management: a new model based on neurocomputing and object technologies by Hojjat Adeli, Asim Karim ISBN 9780203302231, 9780203355930, 9780415244176, 0203302230, 041524417X, 0203355938

  • SKU: EBN-1185484
Zoomable Image
$ 32 $ 40 (-20%)

Status:

Available

4.5

13 reviews
Instant download (eBook) Construction scheduling, cost optimization, and management: a new model based on neurocomputing and object technologies after payment.
Authors:Hojjat Adeli, Asim Karim
Pages:178 pages.
Year:2001
Editon:1
Publisher:Spon Press
Language:english
File Size:4.8 MB
Format:pdf
ISBNS:9780203302231, 9780203355930, 9780415244176, 0203302230, 041524417X, 0203355938
Categories: Ebooks

Product desciption

(Ebook) Construction scheduling, cost optimization, and management: a new model based on neurocomputing and object technologies by Hojjat Adeli, Asim Karim ISBN 9780203302231, 9780203355930, 9780415244176, 0203302230, 041524417X, 0203355938

Presents a general methematical formula for the scheduling of construction projects. Using this formula, repetitive and non-repetitive tasks, work continuity considerations, multiple-crew strategies, and the effects of varying job conditions on the performance of a crew can be modeled. It provides a practical methodology which will be of great benefit to all those involved in construction scheduling and and cost optimization.
*Free conversion of into popular formats such as PDF, DOCX, DOC, AZW, EPUB, and MOBI after payment.

Related Products